RESUMEN
SITUATION
Breakage of the loading pipe in a slurry lagoon during the rainy season, with the lagoon full and an urgent need for emptying.
The breakdown prevented the continuation of normal operations and created a high risk of delays and complications in management.
SOLUTION
Immediate action: within 24 hours we analyse the situation, design the most suitable solution, and organise all the necessary materials.
On the following morning, we installed a new loading pipe adapted to the tank, allowing operations to resume the next day.
BENEFITS
The client was able to continue with the management of the slurry without interruptions, avoiding risks, delays, and problems arising from accumulation.
A fast and efficient service that provides peace of mind even in critical situations, with a reliable solution ready for continuous use.